Blar i Faculty of Mathematics and Natural Sciences på emneord "hydropower"
Viser treff 1-3 av 3
-
Artificial gas supersaturated water from small hydropower plants: methods to detect air entrainment at intakes
(Master thesis, 2022-06-01)Hydropower plants with submerged intake and Francis turbine can release artificial Total Dissolved Gas (TDG) supersaturated water from the plants outlet, if air is drawn into the pressure pipe at intake and dissolved in ... -
Effects of gas supersaturation on migrating Atlantic salmon smolt (Salmo salar) in Evangervatnet
(Master thesis, 2016-11-21)Total dissolved gas supersaturation (TDGS) downstream of power plants may cause harmful effects on the fauna in many rivers. The harmful effects of TDGS are known as gas bubble disease (GBD). TDGS has been proposed as one ... -
Predicting next day’s production in run-of-river hydropower plants using machine learning
(Master thesis, 2023-06-01)This master thesis focuses on time series forecasting using machine learning to predict hourly production in run-of-river hydropower plants. As electrical energy cannot be easily stored, it must be produced and consumed ...