Assessing the potential for gas supersaturation downstream of hydropower plants in Norway, Austria and Germany
Pulg, Ulrich; Lennox, Robert; Enqvist, Martin; Stranzl, Sebastian Franz; Espedal, Espen Olsen; Schwarz, Michael; Lorke, Andreas; Flödl, Peter; Hauer, Christoph; Schletterer, Martin; Halleraker, Jo Halvard; Velle, Gaute
Journal article, Peer reviewed
Published version
Åpne
Permanent lenke
https://hdl.handle.net/11250/3163391Utgivelsesdato
2024Metadata
Vis full innførselSamlinger
- Department of Biological Sciences [2349]
- Registrations from Cristin [10818]
Originalversjon
Science of the Total Environment. 2024, 948, 174645. 10.1016/j.scitotenv.2024.174645Sammendrag
Hydroelectric power facilities can generate episodic total dissolved gas supersaturation (TDGS), which is harmful to aquatic life. We developed a decision tree-based risk assessment to identify the potential for TDGS at hydropower plants and conducted validation measurements at selected facilities. Applying the risk model to Norway's hydropower plants (n = 1696) identified 473 (28 %) high-risk plants characterized by secondary intakes and Francis or Kaplan turbines, which are prone to generating TDGS when air is entrained. More than half of them discharge directly to rivers (283, 17 % of total). Measurements at 11 high-risk plants showed that 8 of them exhibited biologically relevant TDGS (120 % to 229 %). In Austria and Germany, the analysis of hydropower plants was limited due to significant data constraints. Out of 153 hydropower plants in Austria, 80 % were categorized at moderate risk for TDGS. Two Austrian plants were monitored, revealing instances of TDGS in both (up to 125 %). In Germany, out of 403 hydropower plants, 265 (66 %) fell into the moderate risk, with none in the high-risk category. At a dam in the Rhine River, TDGS up to 118 % were observed. Given the uncertainty due to limited data access and the prevalence of run-of-river plants in Austria and Germany, there remains an unclarified risk of TDGS generation in these countries, especially at spillways of dams and below aerated turbines. The results indicate a previously overlooked potential for the generation of biologically harmful TDGS at hydropower installations. It is recommended to systematically screen for TDGS at hydropower installations through risk assessment, monitoring, and, where needed, the implementation of mitigation measures. This is increasingly critical considering the expanding global initiatives in hydropower and efforts to maintain the ecological status of freshwater ecosystems.